job info 1 level 2 lesson 10 firestop applications

c. requires four people to operate, therefore it is not cost efficient Our mission is to be the leading global provider of firestop training and continuing education. Dq Chicken And Biscuits Basket Calories, STUDY. False, Swivels and clevises are used to ? Common substrates found in fire-resistance rated assemblies include, but are not limited to gypsum wallboard assemblies, poured in-place concrete, pre-cast concrete, hollow-core concrete, post-tension concrete, concrete block wall, fluted metal deck, and wood frame assemblies. The complete through penetration has been tested and listed with the different manufacturers caulk. Select one: d. Pillows, What type of firestopping technology expands as much as 25 times in volume? The tools, material, and equipment should be left for cleanup after all the days projects have been completed. Definition 1. Horizontal assembly V. Smoke barrier VI. c. Insulative c. Insulative ChellytheSparky Teacher. job info 1 level 2 lesson 10 firestop applications. Before the pull begins, conductors must be checked for the correct size and type of wire for the job. What may be used in lieu of jack stands? First impressions count when someone walks on the jobsite and meets you for the first time. Job Information Level 2: Lesson 8 Introduction to Firestopping, 1st Year Apprenticeship Final (Cumulative). When selecting a cable puller, what are specifications to look for? d. None of the above, Generally, where in the NEC are fill capacities for conductors in conduit located? a. F Select one: 23=4263\dfrac{2}{3} = \dfrac{42}{63} How To Frame A Skylight Shaft, Select one: Lesson 5: Working with prefixes and powers of 10. b. Intumescent wraps To request a seminar, please complete this form, and submit it to [emailprotected] As you read, discuss the roles of firefighters and dispatchers in the various types of fires. They are heavier than copper conductors.III. The Court, however, is composed of nine individual justices. Select one: Is the penetration temporary or permanent?III. An EJ does not need to be approved by the authority having jurisdiction (AHJ). a. I. and II. When calculating conduit fills, if there are more than two conductors, what percentage of the cross sectional area of the conduit is allowable if there are more than two conductors in the conduit? JOB INFO 1 LEVEL 2 LESSON 10 Which of the following information is typically contained in a firestop certification document? 2 Lesson 5. penetration. miaowlfoy. b. The purple areas True Material should be stacked so the weight is evenly distributed.Select one:TrueFalse. Which of the following through penetration systems represents framed wall construction? A description of the penetrating item c. A rag or sock tied to a string. Which statement pertains to pulling ropes? Rockwool 930 $ 96.24. job info 1 level 2 lesson 10 firestop applications high lords meeting acotar rickey medlocke one lung Call us : 954-649-1972 Menu patrick mulligan venom trousdale turner correctional center handbook mabel injuring wrestlers venmo subpoena compliance job info 1 level 2 lesson 10 firestop applications Books. 41 terms. An EJ can only be used for a specific job. It is not required of the apprentice to feel responsible for the tools as this is the contractors responsibility.III. Describe four protist caused diseases, and name the organisms that cause the diseases. c.No, the tools, material, and equipment should be organized as each smaller job or project is finished, and the trash should not be left to accumulate as work progresses. Before the pull begins, conductors must be checked for the correct size and type of wire for the job. a. July 1, 2022 by by High ambient temperature is not an important factor when determining the allowable ampacity of a conductor. what kind of pass through enters one side of a fire resistive wall and exits the other, when can mortar be used to fill annular space in a concrete fire resistive wall for a through penetration, when annular space is less than 144 square inches and mortar is installed the full thickness of the wall or floor when the penetrating item is metallic pipe, what kind of penetration only breaks one side of a fire resistive wall, what is the maximum annular space around a listed electrical box in a membrane penetration to that does not need additional penetration protection, when can you swap out different manufacturer materials in a fire stop assembly, when a complete assembly has been tested and listed with the swapped material, penetrations in what require an L rating with the approved firestop system, what is the max temperature over the 4 hour firestop assembly ASTM E 814/UL 1479 fire test, what temperature must a one hour assemmbly withstand during testing, what temperature must a four hour assembly withstand during testing, what rating indicates the length of time the unexposed surface of a firestop assembly will stay not exceed 325F, what rating indicates the length of time the assembly will prevent fire or smoke from penetrating the opening it is installed on, what 4 categories are included in a firestop assembly, Wood framed assemblies can not be fire resistant, what materials can be used when installing a fires stop assembly, only the materials designated in the assembly being installed, where are three places to find information on through penetration systems, manufacturers specifiers guide and catalogs, what are some considerations regarding engineering judgments, Engineering judgement can only be used for specific jobs, EJ need to be approved by the authority having jurisdiction, EJ is based on currently listed through penetration systems, EJ lust be issued by qualified fire professional, what are some common types of firestopping material, what firestopping technology expands to nearly 25x its original size, what firestop tech releases chemically bonded water when exposed to heat, what three things must be considered when selecting a through penetration system, what type of assembly is being penetrated. True Lesson 5: Alignment and Measurement. What type of firestopping material releases chemically bound molecules of water when exposed to heat? Write. d. They never come with a factory-spliced eye. True d. All of the above Incorrect, When testing a through penetration system, UL tests various different manufacturers' products in the assembly. In underground conduit applications, the cable should ? Learn faster with spaced repetition. EAL Literacy Phase 1, CLB 1: Reporting an injury at work; EAL Literacy Phase 3, CLB 5: Reading and following a work schedule; Stage I. CLB 1: Safety at work; CLB 2, 3, 4: Getting supplies; CLB 2: Locating tools; CLB 2: Working overtime; CLB 4: Asking for a raise; Stage II. onlye.a., b., and c. Click the card to flip Select one: 5 6 7 2 . A Journeyman is told to run a three-inch conduit across a room and decides to use a channel-iron system. a. be listed for dry locations The proper personal protective equipment (PPE) and safety requirements for the job. Level 2. When selecting a through penetration system, which of the following questions need to be considered?I. The ? d. 3000-3999. Where can an Electrical Worker find information on listed through penetration systems? c. F-C-1293 c. T When a conduit passes through only one side of a fire-resistive wall assembly, it is considered as a ? The common sizes for steel fish tapes are 1/8" and 1/4". hours.Select one: A(n) ? Study Job Information Level 1: Lesson 10 Using and Installing Twist-On Wire Connectors flashcards from Jesus Felix' . Firestop Instructional Training (FIT) Level 2 Program Presented by Mike Zanotelli & Justin Evatt March 16 th - 17 2017 Training will begin at 7:30am on both Thursday and Friday. Flashcards. Rings and jewelry worn on the job are ? Which of the following is not a common type of firestop material? . by Gail Gibbons and/or other books about firefighters. The ? d. Wire brush the surface of the aluminum conductor to remove any aluminum oxide barrier. A neat appearance can be a great asset to the contractors reputation.II. they may come with a factory-spliced pulling eye, Conductors can be safely hooked to the rope by using pulling grips and pulling heads. Union contractors. penetration.Select one: When penetrating a concrete fire-resistive wall or floor assembly with RMC, it is not acceptable to use mortar to fill the annular space.Select one:TrueFalse. 0 : SB & SU CBC Manitoba EAL lesson 26 Job Search Advice p 10 -17. franklin_nickerson. Select one: False, Where can an Electrical Worker find information on listed through penetration systems? Which of the following through penetration systems represents a wall is being penetrated? Select one: (a) Write the net ionic equation for the reaction that takes place. Camshaft19. a. always be placed at the bottom of the panel How much will the material cost?II. They are typically compact stranded.II. Concrete blocks. Sets found in the same folder. ICC Preferred Provider course names, numbers, CEUs: 2 hr seminar: IFC Firestop 102, Introduction to firestopping (Course No. d. Article 310, trouble-free installation can be achieved when using listed aluminum conductors with listed connectors. Why might an employer insist that the electrical worker present a neat appearance? Learn. Job Information Level 2 Lesson 10. When planning a wire pull, the ___?__ determines the number of workers that will be needed to complete the job. What type of fire rated assembly is being penetrated? 54 Cards - 3 Decks - 444 Learners Sample Decks: Lesson 1: Building Wire Construction and Insulation Properties, Lesson 2: How . d. Intumescent, What type of firestopping material releases chemically bound molecules of water when exposed to heat? The customerIV. b. When using sheaves and rollers, they should ___?___. b. can add a great deal of safety and communication to a wire pull Post author: Post published: April 16, 2023 Post category: what size to get for oversized hoodie Post comments: izuku betrayed by ochako fanfiction izuku betrayed by ochako fanfiction No, the tools, material, and equipment should be organized as each smaller job or project is finished, and the trash should not be left to accumulate as work progresses. When terminating aluminum conductors, which of these methods are recommended? c. T Select one: b. F-W-1325 Assuming there are no other electrical boxes on the opposite side of the wall, this installation does not require any penetration protection as long as the annular space between the electrical box and the wall membrane does not exceed ? An online tool for scheduling appointments for required DOB inspections must be used. The common sizes for steel fish tapes are 1/8" and 1/4". How many people died in the MGM Grand Hotel fire as a result of smoke inhalation and carbon monoxide?Select one: Of the people who died in the MGM Grand Hotel fire, 79% ? A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? the complete through penetration has been testedand listed with the different manufacturers chaulk. b. Endothermic This process allows flexibility for the installer to choose from various manufacturers products.Select one:TrueFalse. d. Intumescent. Cable puller--> SIMpull head pulling grips -->Dual Remote foot switch--> Roller sheaves--> 12", 24", 18", Swivel and clevis. Smart phone or tablet applications .Select one: a.carrying all of the tools the Journeyman might need for that days tasks, b.laying out the worksite before the Journeyman arrives so the Journeyman can start working right away, c.mentally viewing the job and breaking down the tasks; the apprentice can then plan the tools and materials that will be needed, d.reading the blueprints, so the apprentice can provide a material takeoff and gather the materials needed for that days tasks, mentally viewing the job and breaking down the tasks; the apprentice can then plan the tools and materials that will be needed. b. can have a fire-resistance rating of one, two, three, or four hours.Select one: What is the minimum fire-resistance rating for a fire partition?Select one: A(n) ? Select one: (c) What are the molar concentrations of the ions that remain in the solution after the reaction is complete? c. The rated maximum pulling force. Hunter_Benson7. audiences. In underground conduit applications, the cable should ?. the complete through penetration system would need to be tested and listed with the alternative manufacturer's caulk. Tools used on a jobsite are expensive. job info 1 lvl 2 lesson 9. Fax: 1-908-231-8415. balochistan police whatsapp group link. must have sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall.Select one: What IBC chapter covers the requirements for fire-resistant rated assemblies?Select one: Browse over 1 million classes created by top students, professors, publishers, and experts. Learn faster with spaced repetition. Study Job Info - Lesson 8 flashcards from Dominick Romero's class online, or in Brainscape's iPhone or Android app. rating indicates the length of time (in hours) that the firestop assembly will not exceed 325F on the unexposed surface during the fire test. Orientation Level 1: Lesson 1 How To Study This Course And Achieve Your Personal Goals. furniture . c.It should be stood up and placed in a stairwell where there is less traffic. b. I., II., and III. building code violations that contributed to toxic smoke traveling to the upper floors of the hotel.Select one: According to the National Fire Protection Association (NFPA), survivors caught in a fire cannot typically see more than ? Select one: magandang epekto ng turismo sa pilipinas; shooting in bryan, texas today; female to male surgery cost in thailand; job info 1 level 2 lesson 10 firestop applications. Wood framed assemblies cannot be classified as fire-resistant assemblies. schuyler bible durability. Through penetrations in concrete floor assemblies can have the annular space filled with mortar provided that the penetrating item is ? Step 2: Read aloud Fire!Fire! job info 1 level 2 lesson 10 firestop applicationseagles hotel california tour 2022 setlisteagles hotel california tour 2022 setlist Copper has a higher tensile strength than aluminum. True DOB NOW provides robust online accounts, making it easier to submit applications, make payments, schedule appointments, check the status of an application or inspection, pull permits, and make renewals. . d.An EJ must be issued by a qualified fire professional. Franklin Medical Center Medical Records, Select one: B. penetration. b. manufacturer Simply register and create an Access STI account by clicking the "Login Here" button. there are associated ___ whenever current flows through a conductor utilization, effects PLAY. The customer may visit the jobsite from time to time and a neat appearance by the electrical worker(s) can mean the difference in getting more work in the future with that customer or not.IV. Exam is proctored via webcam. Assuming there are no other electrical boxes on the opposite side of the wall, this installation does not require any penetration protection as long as the annular space between the electrical box and the wall membrane does not exceed ? 31 terms. This process allows flexibility for the installer to choose from various manufacturers' products. What National Electrical Code (NEC) chapter covers the requirements for firestopping? True What National Electrical Code (NEC) chapter covers the requirements for firestopping?Select one: A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? When is it OK to leave tools and/or materials on a ladder, stairway, or in a passageway?Select one: b.It is never OK to leave tools and/or materials on a ladder, stairway, or in a passageway. EAL Literacy. Fire and Life Safety General# 1. Who decides what fire alarm and fire sprinkler deferred submittal documents can be reviewed in the field? a. I., III., and IV. b. Other methods available. a. contractor c. They may come with a factory-spliced pulling eye. Pearson BTEC Level 2 Diploma 60 credits The 60-credit BTEC Level 2 Diploma has potential to prepare learners for employment in the appropriate vocational sector and it is suitable for those who have decided that they wish to enter a particular area of work. a. F Select one: c.It is never OK to leave tools or materials on a ladder, but it is OK to leave materials and tools in a stairway or in a passageway as needed. Public Right-of-Way Encroachments Work and Site Requirements Select one:a.A description of the penetrating itemb.A detail drawingc.Specific products to be used for the installationd.a. d. The white areas. Select one: Why should an apprentice feel a responsibility for tools used on a jobsite? False, When firestopping a through penetration, the Electrical Worker must install the firestopping exactly as specified. Job Info 1, lvl 2 lesson 1 Flashcards | Chegg.com Job Info 1, lvl 2 lesson 1. Blueprints Lvl 2 The proper personal protective equipment (PPE) and safety requirements for the job. I. Him/herselfII. of the IBC.Select one: A firewall can be used to ? After creating your account, click in the Firestop University section on the Access STI tab and select enrollment instructions to get started. c. Chapter 5 This process allows flexibility for the installer to choose from various manufacturers' products. Study Job Information Level 1: Lesson 2 The Workplace of an Electrical Worker flashcards from Jesus Felix' . Print the lesson To print the English conversation about a man called John having a job interview right click on a white space and choose print. Level 3 ASA Requirements: Outside US: +1-908-526-8000 + Ext 2. Created by. d. slows the wire pull down, The most common sizes for steel fish tapes are 1/8" and 1/4". When selecting a cable puller, what are specifications to look for? .Select one: When testing a through penetration system, UL tests various different manufacturers products in the assembly. b. be listed for wet locations Annular space: Minimum: 0 inches (point of contact), Maximum: 2 inches. b.The apprentice should try to convince the Journeyman to change his or her mind. Which of the following is not included in a complete through penetration firestop system? c.The matter should be brought to the attention of the foreman or contractor. 2 Use the tables above to find average salaries for teachers by state and career field and check with resources such as teachers associations to find current information for Start studying firestop. can add a great deal of safety and communication to a wire pull. A pair of skaters who are initially at rest push against each other so that they move in opposite directions. An application-based program that teaches the 10 critical health skills that align with the National Health Standards. Assign oxidation numbers to the atoms in each of the following species: NH4NO3, CaMgSiO4, Fe(CN)^4- 6, B2H6, BaH2, PbCI2, Cu2O(SO4), S4O^2- 6. 1, Lvl. True Wall or Floor type: Concrete block wall Wall or Floor thickness: 4-1/2 inches a. c. be thinner for easier installation .Select one: The temperature requirement that a four-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? Learn faster with spaced repetition. They provide the same ampacity as a copper conductor when both are the same size conductor. A listed through penetration that identifies a specific manufacturer's intumescent caulk can be installed using a different manufacturer's caulk as long as which of the following requirements are met? Penetrations made in a(n) ? b. Each Division can have up to 4 levels, with each subsequent level providing more detail regarding the specification. a. connect pulling head and pulling rope Job 1, Level 2, Lesson 6:Using the Metric sys. Which of the following through penetration systems represents a wall is being penetrated?Select one: Which of the following through penetration systems represents framed wall construction?Select one: A listed through penetration system that identifies a metallic pipe penetrating the fire-resistant assembly has a numeric value in the system number of ? This area will help you understand the basics of each type of firestop application. Plain chart paper could also be used. Select one: Firewall II. is commonly used to separate sleeping units in the same building.Select one: A(n) ? connect4education register; don't be a felix cdcr video; westfield knox redevelopment 2020 b. True b. Introduction To Leadership Essay, What type of firestopping technology expands as much as 25 times in volume? 2 c. 3 d. 5 Click the card to flip Definition 1 / 53 3 Click the card to flip Flashcards Learn Test Match Created by Dru_Leppek8 IBEW Terms in this set (53) What is the annular space of the opening?IV. The backing material (mineral wool, insulation etc.) The apprentice should respect the Journeymans experience and should defer to the Journeyman. While emphasizing critical social and emotional skills, Teen Health explores up-to-date information and statistics on timely, relevant topics. When performing a firestop installation that has point contact between the penetrating item and the wall or floor surface, there is always a requirement to apply a 1/4-inch bead between the penetrating item and the wall or floor surface. In this lesson, students will talk about what is important in a job, and read about some unusual voluntary jobs. wire brush the surface of the aluminum conductor to remove any aluminum oxide barrier. Who is responsible for work performed on a project?Select one: What dangers are associated with accumulated trash on a jobsite?Select one: b.Accumulated trash makes tripping or falls possible. b. Our trainings are offered in three formats; attend a live training session, attend a live webinar, or learn at your own pace on-line. franklin_nickerson. Select one: Learn vocabulary, terms, and more with flashcards, games, and other study tools. Article 250 High ambient temperature is not an important factor when determining the allowable ampacity of a conductor. c. Specific products to be used for the installation determines the number of workers that will be needed to complete the job. d. W, The ? during a four-hour period. georgia state park jobs; Payroll Services. A trouble-free installation can be achieved when using listed aluminum conductors with listed connectors, Copper has a higher tensile strength than aluminum. a. W-L-1453 Study Job Info - Lesson 7 flashcards from Dominick Romero's class online, or in Brainscape's iPhone or Android app. they may come with a factory-spliced pulling eye, Conductors can be safely hooked to the rope by using pulling grips and pulling heads. They have low breakage strength. Any type of connector can be used to terminate aluminum conductors. Select one: Training Workshop: Free of Charge The 1 page documents Learn. No credentials have been added.yet. . Select one: c. F-C-1293 The temperature requirement that a one-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? Test. For example, the average special education teacher salary is $65,710 at the secondary school level. Write. Evidence of the justice's philosophy may be found in his or her opinions in cases involving freedom of speech or religion; the commerce clause and states' rights; Fourth Amendment issues; and the death penalty. . d.No, trash should be organized and picked up as each smaller job or project is finished. Job Information Level 1: Lesson 5 Alignment and Measurement Flashcards by Jesus Felix | Brainscape Brainscape Find Flashcards Why It Works Educators What type of fire rated assembly is being penetrated? Select one: These students will be able to understand, but may not be able to produce, simple language such as 'yes,' 'no,' 'good,' 'bad,' and in many cases the numbers 1-10. A listed electrical box for use in fire-resistive assemblies is being installed in a two-hour rated wall. Match. to an electrician.Select one: What should be done with a ladder when it is not in use?Select one: a.It should be laid down or lashed where it cannot fall or be blown over. b. It is never OK to leave tools and/or materials on a ladder, stairway, or in a passageway. be listed for wet locations. What is the most important consideration when planning a large wire pull? Return to the job in six months to retighten the set screws. - the ease of use [emailprotected] A description of the penetrating item Job Information Level 2 Lesson 7. d. The sealant (caulk, putty, etc.) Orientation Level 1: Lesson 2 The Attributes Of An Ibew/Neca Apprenticeship, Orientation Level 1: Lesson 3 Knowing Your Apprenticeship And Your Responsibilities, Orientation Level 1: Lesson 4 The Ibew And Its History, Orientation Level 1: Lesson 5 Neca's Structure And Heritage, Orientation Level 1: Lesson 6 Your Job And The Future It Holds For You, Orientation Level 1: Lesson 7 Sexual Harassment, Orientation Level 1: Lesson 8 The Economics Of Employment, Orientation Level 1: Lesson 9 Safety Never Takes A Break, Job Information Level 1: Lesson 1 Identifying Some Basic Tools Of The Trade, Job Information Level 1: Lesson 2 The Workplace Of An Electrical Worker, Job Information Level 1: Lesson 3 The Proper Care And Use Of Ladders, Job Information Level 1: Lesson 4 Choosing And Installing The Correct Masonry Fastener, Job Information Level 1: Lesson 5 Alignment And Measurement, Job Information Level 1: Lesson 6 The Reality Of Electrical Shock, Job Information Level 1: Lesson 7 Electrical Safety, Job Information Level 1: Lesson 8 Understanding The Function And Design Of Ground Fault Interrupters, Job Information Level 1: Lesson 9 Caution Overhead Work In Progress, Job Information Level 1: Lesson 10 Using And Installing Twist On Wire Connectors, Job Information Level 2: Lesson 1 Building Wire Construction And Insulation Properties, Job Information Level 2: Lesson 2 How Building Wire Is Sized, Job Information Level 2: Lesson 3 Working Properly With Aluminum Conductors, Job Information Level 2: Lesson 4 Identifying Commonly Used Electrical Materials, Job Information Level 2: Lesson 5 Working With Prefixes And Powers Of 10, Job Information Level 2: Lesson 6 Using The Metric System And Metrication Changes, Job Information Level 2: Lesson 7 How To Solve Basic Algebraic Equations, Job Information Level 2: Lesson 8 Introduction To Firestopping, Job Information Level 2: Lesson 9 Fire Resistant Wall And Floor Assembly Penetrations, Job Information Level 2: Lesson 10 Firestop Applications, Job Information Level 2: Lesson 11 Wire Pulling Techniques, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 1 An Introduction To The National Electrical Code, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 2 Interpreting The Language Of The NecArticle 100, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 3 Understanding And Applying Article 110 Of The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 4 Understanding And Applying Article 110 Of The Nec Ii, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 5 General Building Wire Properties And The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 6 Understanding Conductor Insulation And Nec Specifications, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 7 Introduction To Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 8 General Requirements Related To Installing Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 9 General Requirements Related To Installing Industrial Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 10 Specific Receptacle Installation Requirements, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 11 Specific Switch Installation Requirements, Blueprints Level 1: Lesson 1 The Fundamentals Of Blueprint Drawing And How To Make Proper Sketches, Blueprints Level 1: Lesson 2 Understanding Architectural Views And How To Draw Them, Blueprints Level 1: Lesson 3 Recognizing And Understanding Common Scales Used On Blueprints, Blueprints Level 1: Lesson 4 Icp 1: Math For Blueprint Reading, Blueprints Level 1: Lesson 5 Using Blueprints Specifications, Elevations And Schedules Properly, Blueprints Level 1: Lesson 6 Understanding And Drawing Electrical Symbols Used On Blueprints, Blueprints Level 1: Lesson 7 Understanding And Drawing Mechanical Symbols Used On Blueprints, Blueprints Level 1: Lesson 8 Understanding How To Properly Use A Residential Blueprint, Blueprints Level 1: Lesson 9 Reading And Analyzing A Residential Blueprint, Dc Theory Level 2: Lesson 1 The Series Circuit, Dc Theory Level 2: Lesson 2 Understanding And Calculating Resistance In Dc Series Circuits, Dc Theory Level 2: Lesson 3 How Current Reacts In Dc Series Circuits, Dc Theory Level 2: Lesson 4 How Voltage Functions In Dc Series Circuits, Dc Theory Level 2: Lesson 5 How To Calculate Power In Dc Series Circuitss, Dc Theory Level 2: Lesson 6 Energized Circuits And The Potential Hazards They Possess, Dc Theory Level 2: Lesson 7 How To Draw Basic Electrical Circuits Correctly, Dc Theory Level 2: Lesson 8 Introduction To Test Instruments, Dc Theory Level 3: Lesson 1 How Current Reacts In Dc Parallel Circuits, Dc Theory Level 3: Lesson 2 Understanding Resistance In Dc Parallel Circuits, Dc Theory Level 3: Lesson 3 Working With Ratios And Proportion, Dc Theory Level 3: Lesson 4 How Voltage Functions In Dc Parallel Circuits, Dc Theory Level 3: Lesson 5 How To Calculate Power In Dc Parallel Circuits, Dc Theory Level 4: Lesson 1 Understanding Resistance In Dc Combination Circuits, Dc Theory Level 4: Lesson 2 How Current Reacts In Dc Combination Circuits, Dc Theory Level 4: Lesson 3 How Voltage Functions In Dc Combination Circuits, Dc Theory Level 4: Lesson 4 How To Calculate Power In Dc Combination Circuits, Dc Theory Level 4: Lesson 5 How Voltage And Current Dividers Work, Dc Theory Level 4: Lesson 6 The Design And Operation Of The 3 Wire, Single Phase System.

Pepper Inside A Pepper Superstition, What Happened To The Sugar Cane Train In Maui, Bulldog Electric Panel, Articles J